Cheap Jordans | New Jordans | Louis Vuitton Outlet | Louis Vuitton Sale | cartier sunglasses | www.ems-sports.com | www.dreamstock.us | showlace.com | Cheap Jerseys

Louis Vuitton Outlet | Louis Vuitton Outlet | Louis Vuitton Sale | Louis Vuitton Shoes | Louis Vuitton Online Store

Torbay Connected

Torbay Connected Framework

This framework contains the first phase study corridor between Torquay Harbour and Cockington Court. 

Key locations for improving the legibility of the route so prioritising how the perceptions of the corridor can be enhanced are shown below.

Reproduced from the Ordnance Survey mapping with the permission of the Controller of HMSO. (c) Crown Copyright.
Unauthorised reproduction infringes crown copyright and may lead to prosecution or civil proceedings. Torbay Council LA079782

Framework Layers:

Key routes, buildings and potential locations for improving the legibility of the route are shown in different layers below.

FRAMEWORK Basemap
Pilot Corridor
Potential Developments
Creative Interventions

Site recommendations

Please see here for our recommendations for priority buildings and spaces identified above.

« Previous Next »
Contact  |  Terms of Use  |  cheap jordans All rights reserved. Copyright © 2010 equally shared between Torbay Council and Ginkgo Projects Ltd
longchamp bagLongchamp Le Pliageoakley glasögonoakley solglasögonsolglasögon oakleyghd situpsghd sverigevad betyder ghdbilliga nike air maxnike air max 90nike air max 90 damnike air max 90 reanike air max barnnike air max damlongchamp selongchamp sverigelongchamp Väskacheap ray ban sunglassesray bans sunglassessunglasses ray bancheap ray ban sunglassescheap ray bansfake ray banshollisterhollister göteborghollister kläderhollister malmöhollister onlinehollister sverige